SELARUM Beta

Every selection.
Every room.
One scan.

For home builders and design studios. Draw the rooms on your plans, attach every selection, tile to trim, and post a QR placard at the door. Every trade who scans it sees exactly what was chosen for that room, on their own phone. No app, no login.

Invites go out within a few days, builders and design studios first. We use your address only to send it. Questions? hello@selarum.com

The kitchen plan, its eight selections numbered and pinned to what they specify. The key follows.12345678
The kitchen on the plan, eight selections pinned to what they specify.
  1. 1Faucet
  2. 2Switches
  3. 3Wall paint
  4. 4Backsplash
  5. 5Island top
  6. 6Cabinets
  7. 7Pendants
  8. 8Range

General notes

  1. One scan opens the room's whole schedule.
  2. The numbers match on the plan, the placard and the phone.
  3. Trades need no app and no login.
  4. When a plan is revised, the placard's page says so.
Drawing 2 on sheet A-0, an enlarged kitchen plan. Eight numbered keynotes, each with a leader to what its selection specifies: 1 the faucet, 2 the switch bank at the dining opening, 3 the walls, 4 the backsplash, 5 the island top, 6 the perimeter cabinets, 7 the three pendants over the island and 8 the range. Detail 1 marks the placard at the dining opening.DWREFS18′-6″5′-0″ window13′-0″KITCHEN101 · 240 SFPANTRYDININGFAMILY1A-0PLACARDN123456782A-0ENLARGED KITCHEN PLANSCALE: 1/2″ = 1′-0″0248 ft
Placard at the kitchen doorScan it with your phone to see this kitchen as a trade does, or open the demo room.

Kitchen schedule

What the trades see when they scan the door, and where each item stands.

No.TradeSelectionSpecStatus
1PlumbingPull-down faucetKohler K-7505, brushed bronzeOrdered, arrives Oct 20
2ElectricalOutlets and switchesLutron Diva, whiteInstalled Oct 11, marked by Dee
3PaintWallsSherwin-Williams SW 7008, eggshellApproved Oct 2
4TileBacksplashFireclay, Zellige 4×4, MintInstalled Oct 9, marked by Luis
5CountertopIsland topCaesarstone Calacatta Nuvo, 3 cmOn site
6CabinetsPerimeter cabinetsInset Shaker, painted SW 7006Ordered, arrives Nov 3
7LightingIsland pendants (3)Visual Comfort, Hicks LWaiting on the client
8AppliancesRangeWolf 36″ dual-fuel, 6 burnersApproved Oct 2
A-1

Nothing is ordered without the client's yes.

Before a selection reaches the door, the homeowner approves it from a private link on their phone, with no account. Requests for changes come back to you in their own words. Approved picks get ordered, and the trades mark them installed when they're in.

Request an inviteBuilders and design studios first. Invites go out within a few days.

Who does what

Designer or builder
Draws the rooms and attaches the selections.
Homeowner
Approves each pick from a link.
Trades
Scan the door, ask questions, mark it installed.

One selection, start to finish: the backsplash

  1. SpecifiedThe designer attaches it to the kitchen.Sep 28
  2. ApprovedThe Okafors say yes from their link.Oct 2
  3. OrderedLogged with an arrival date.Oct 3
  4. On siteReceived at the house.Oct 6
  5. InstalledLuis marks it from the door.Oct 9
The homeowner's linkApprove, ask for changes or decline. Nothing to install.
The trade at the doorMark it installed. Items still waiting on the client can't be.
SheetA-1, the client's side
ShownThe Okafor kitchen, an example
Contacthello@selarum.com